A consultancy study, CE45/2008(CE) - Liantang/Heung Yuen Wai Boundary Control Point and Associated Works – Investigation, was commissioned in April 2009 to review the proposed layout and facilities of the Liantang/Heung Yuen Wai BCP and the alignment of its connecting road, develop preliminary design of the works and conduct relevant impact assessments including Environmental Impact Assessment study in order to take forward the development of the new BCP. Furthermore, public consultation was conducted in the course of the study seeking views of the local stakeholders, particularly those land lots affected by the proposed road works.

The investigation and preliminary design study under the consultancy had been substantially completed in end 2010.

 
 
 
     
  Design and Construction (D&C) Consultancy  
 
  • Agreement No: CE 38/2010 (CE) - Liantang/Heung Yuen Wai Boundary Control Point and Associated Works – Design and Construction
  • Study Commencement Date: March 2011
  • Anticipated Study Completion Date: December 2020
 
 

top

 
 
 
     
  Objective of D&C Consultancy  
 
  • To carry out detailed design of the site formation and infrastructure works for the project, produce detailed cost estimates and programmes for the Project and carry out any supplementary impact studies.
  • To prepare and make available the tender documents and all matters or things which may be necessary or is required to enable CEDD to invite tenders, and carry out assessment of tenders and make tender recommendations.
  • To supervise the construction works and to achieve satisfactory implementation and commissioning of the Works.
  • To provide all records of the completed contract works and complete all the works contract final accounts.

top

 
 
 
     
  Construction Contract Packages  
 

To facilitate the project implementation, the works has been packaged into the following contracts:

 
 
  • Geotechnical Investigation Contract (CV/2011/03)
  • Contract 2 (CV/2012/08)
  • Contract 3 (CV/2012/09)
  • Contract 4 (NE/2014/02)
  • Contract 5 (CV/2013/03)
  • Contract 6 (CV/2013/08)
  • Contract 7 (NE/2014/03)
 
  Key plan of construction contract packages  
     
  Geotechnical Investigation Contract  
     
  To obtain further ground information for the detailed design of the project works, ground investigation works are being carried out. Details of the ground investigation contract are as follows:  
 

Contract No.:

CV/2011/03

Contract Name:

Liantang / Heung Yuen Wai Boundary Control Point – Ground Investigation for Site Formation and Infrastructure Works

Contract Period:

The works commenced in October 2011 and was completed in January 2013.

Major Scope of Works:

The works mainly comprise land ground investigation including trial pits, drillholes, horizontal directional coring, boulder investigation, geophysics surveys, in-situ testings, field measurement and laboratory testing of soil and rock samples

Contractor:

Gammon Construction Ltd.

 
     
  Contract 2 (CV/2012/08)  
 

Contract No.:

CV/2012/08

Contract Name:

Liantang/ Heung Yuen Wai Boundary Control Point Site Formation and Infrastructure Works - Contract 2

Contract Period:

The works commenced in December 2013 and will take about 54 months to complete.

Major Scope of Works:

The works include construction of a dual two-lane trunk road (with about 0.4km of at-grade road and 4.8km of tunnel) connecting the Fanling Interchange with the proposed Sha Tau Kok Interchange, provision and installation of ventilation system, E&M works and building services works for Lung Shan tunnel and Cheung Shan tunnel and their portal buildings, Tunnel Administration Building adjacent to Wo Keng Shan Road and associated landscaping works, drainage / sewerage, waterworks, utilities and traffic engineering works.

Contractor:

Dragages Hong Kong Limited

 
     
  Contract 3 (CV/2012/09)  
 

Contract No.:

CV/2012/09

Contract Name:

Liantang/ Heung Yuen Wai Boundary Control Point Site Formation and Infrastructure Works - Contract 3

Contract Period:

The works commenced in July 2013 and will take about 63 months to complete.

Major Scope of Works:

The works include construction of four link roads connecting the existing Fanling Highway with the south portal of the Lung Shan Tunnel, realignment of the existing Tai Wo Service Road West and Tai Wo Service Road East, widening portion of the existing Fanling Highway and the associated works, demolishment of the existing vehicular bridge and footbridge at Kiu Tau and reconstruction of the Kiu Tau Footbridge.

Contractor:

Chun Wo Construction and Engineering Company Limited

 
     
  Contract 4 (NE/2014/02)  
 

Contract No.:

NE/2014/02

Contract Name:

Liantang/ Heung Yuen Wai Boundary Control Point Site Formation and Infrastructure Works - Contract 4

Contract Period:

The works commenced in April 2016 and will be completed in early 2021.(Major part of the works will be completed by end 2018)

Major Scope of Works:

The works mainly include design, supply, delivery, installation, testing and commissioning of a traffic control and surveillance system for the connecting road linking up the Liantang/Heung Yuen Wai Boundary Control Point and the existing Fanling Highway. The system will mainly consist of computer systems, communication facilities, variable message signs and other traffic field equipment.

Contractor:

Siemens Limited

 
     
  Contract 5 (CV/2013/03)  
 

Contract No.:

CV/2013/03

Contract Name:

Liantang/ Heung Yuen Wai Boundary Control Point Site Formation and Infrastructure Works - Contract 5

Contract Period:

The works commenced in April 2013 and was completed in January 2016.

Major Scope of Works:

The works include site formation of about 23 hectares of land for the development of the new Boundary Control Point (BCP), diversion/modification of Lin Ma Hang Road, landscaping works, drainage/sewerage, waterworks, utilities and traffic engineering works.

Contractor:

Sang Hing Civil - Richwell Machinery JV

 
     
  Contract 6 (CV/2013/08)  
 

Contract No.:

CV/2013/08

Contract Name:

Liantang/ Heung Yuen Wai Boundary Control Point Site Formation and Infrastructure Works - Contract 6

Contract Period:

The works commenced in June 2015 and will take about 40 months to complete.

Major Scope of Works:

The works include construction of a 4.6km long dual two-lane trunk road (with about 0.6km at grade roads, 3.3km viaducts and a 0.7km tunnel) connecting Sha Tau Kok Road Interchange to BCP, and the associated environmental mitigation measures, landscaping, drainage/sewerage, waterworks and utilities works.

Contractor:

CRBC-CEC-KADEN Joint Venture

 
     
  Contract 7 (NE/2014/03)  
 

Contract No.:

NE/2014/03

Contract Name:

Liantang/ Heung Yuen Wai Boundary Control Point Site Formation and Infrastructure Works - Contract 7

Contract Period:

The works commenced in December 2015 and will take about 33 months to complete.

Major Scope of Works:

The works include construction of the Hong Kong Special Administrative Region portion of four vehicular bridges and one pedestrian bridge crossing Shenzhen River.

Contractor:

Kwan On-Richwell-SCG JV

 
     
  top  
     